Gravity

04 · Lift

Lift is sized to the gap.

When glide drifts past gravity, Lift is the response. It ranges from re-ordering a queue to rewriting the plan, and the state of the item decides which one applies.

A glide path lands six days past the gravity line. Lift is applied, and the path bends to land three days before it. GRAVITY LIFT BREAKING ORBIT · ALTITUDE −6d CAPTURED · ALTITUDE +3d

Lift by state

Four kinds of Lift.

DriftingLight LiftCourse correction

“We need small adjustments.”

  • Re-prioritize within the queue
  • Reduce work in progress and focus effort
  • Remove small blockers

Local, tactical, low cost.

Breaking OrbitModerate LiftRecovery actions

“We must actively intervene.”

  • Add capacity: more engineers, more parallel work
  • Re-sequence dependencies
  • Fast-track critical work

Needs cross-team coordination and explicit trade-offs. Still salvageable within the current plan.

Unstable OrbitDiagnostic LiftModel stabilization

“We cannot act until we fix the model.”

  • Fix missing or incorrect dependencies
  • Reconcile conflicting timelines
  • Validate assumptions

Happens before execution. It restores trust in the system, which makes every other decision possible.

Gravity WellStructural LiftEscape the well

“This cannot be fixed within the current system.”

  • Re-baseline the timeline
  • De-scope deliverables
  • Redesign architecture or sequencing
  • Change team structure

Strategic. Requires a leadership decision. Optimization can't solve it.

Match Lift to cause

The color says how bad. The drag says why.

Two Red items can need opposite responses. One team is short of people; another is drowning in scope. Before choosing a Lift, name the drag source behind the drift.

Adding capacity fixes thrust loss. It makes scope growth and coordination load worse.

Governance

Lift is mandatory, not optional.

  1. Alerting. Divergence surfaces automatically, not in a status meeting. Executives see Amber, Red and Black only.
  2. Action plans. Amber and Red require a written Lift plan.
  3. Delegation. Every Lift action becomes an assigned task on the board.
  4. Structural reset. Black triggers a formal re-baseline of the gravity itself.

Feedback

Track whether the Lift worked.

Drift trend shows whether a Lift is working within a week or two. If an item stays Amber or Red with a level or falling trend after its Lift, the next divergence on that work starts one tier higher. Over time, the record of which Lifts worked improves the glide forecast itself.

After LiftReadingNext step
Drifting ▲Lift is workingKeep it in place
Drifting ▼Light Lift is not enoughTreat as Red and apply moderate Lift
Breaking Orbit ▶Moderate Lift has stalledRun the recovery test
Gravity WellRecovery test failedLeadership decision in the next Uplink